Skip to content

Opening book details…

About this document

OBO FM PII B 08 v.00 Demolition Permit 1 2 by king alido is a document available to read on EtoBox.

The document outlines the conditions and requirements for obtaining a demolition permit from the Building Official, including safety measures, utility disconnections, and responsibilities of the permittee. It specifies that demolition must adhere to the National Building Code of the Philippines and includes provisions for public safety and property protection. The permit is revocable if conditions are not met, and the demolition must be completed within 30 days of commencement.

Author
king alido
Language
EN