Opening book details…
Can I read Outstanding Drawing Submission Response on EtoBox?
Outstanding Drawing Submission Response by Adyam Yonas is a document available to read on EtoBox.
What is Outstanding Drawing Submission Response about?
China First Highway Engineering Company Ltd wrote a letter in response to a request from STADIA Engineering Works Consultant PLC regarding outstanding working drawings needed for construction. CFHEC explained they were waiting on updated bridge design drawings from STADIA before submitting their bridge substructure and superstructure working drawings. CFHEC has now prepared some preliminary drawings based on the new information from STADIA and will submit additional drawings once a geotechnical report is fi
- Author
- Adyam Yonas
- Language
- EN