About this document
132kV Substation Control System Signals by Shah Aizat Razali is a document available to read on EtoBox.
The document outlines the details of the 29.99MWac Kenyir Gunkul Solar Project, specifically focusing on the substation extension and underground transmission cable works. It includes revision history, drawing titles, and a list of NCC signals related to the 132kV substation control system. The document is structured with multiple sheets detailing various aspects of the project and is marked as
- Author
- Shah Aizat Razali
- Language
- EN