Can I read Paver Block Fixing Labour Rates on EtoBox?

Paver Block Fixing Labour Rates by Sahil is a document available to read on EtoBox.

What is Paver Block Fixing Labour Rates about?

This document provides a cost estimate for construction work divided into two parts: Schedule and Non-Schedule. The Schedule includes 27 line items for work like excavation, concrete, masonry, plastering, doors/windows. The total for Schedule is Rs. 326873.60. The Non-Schedule includes 16 line items like pile boring, precast slabs, tiles with a total of Rs. 84773.19. Additional costs are Rs. 68000 for cement and Rs. 127750 for steel reinforcement. The overall grand total for the estimated construction work