An internal inspection report for trial assembly of columns DU 099 & 100 found: water level was a maximum of 3 mm which was acceptable, a maximum parting off of 10 mm was noticed at the center of the column on both sides, alignment was a maximum of 7 mm, sweep/chamber was a maximum of 6 mm, washer plate needed fixing, bottom side match marking punch needed to be done, stool plate bends needed correcting, DB punch needed to be done, and welding visual work needed completing.