Can I read Functional Check Report for 33kV Substation on EtoBox?

Functional Check Report for 33kV Substation by Muhammed Sabic is a document available to read on EtoBox.

What is Functional Check Report for 33kV Substation about?

The document is a functional check report for the 33kV and 11kV Load Transfer Works at the ADDF-2 PRY substation, detailing various tests conducted on the electrical systems. It includes results from interlock schemes, trip circuits, lockout relay operations, and indication checks, all of which were witnessed and approved by designated personnel. The tests were performed on May 19, 2020, and the overall status of the systems is reported as satisfactory.