Skip to content

Opening book details…

About this document

U-Trough Wall Bar Bending Schedule by shashi rajhans is a document available to read on EtoBox.

This document provides a bar bending schedule for the reinforcement of a U-trough wall. It lists 9 different bar marks with information on the bar shape, diameter, spacing, lengths and quantities required. The total steel quantity required is calculated as 5439.3 kg and rounded up to 6 metric tons when including a 10% addition for lap and bends.

Author
shashi rajhans
Language
EN