Testing and Commissioning Report: Stair Floor S.F.01 by HARISH ROHAN is a document available to read on EtoBox.

The Testing and Commissioning Report for Project AP 06 at Pearl Qatar details the inspection of the stair floor equipment S.F.01 conducted on February 6, 2024. All activities, including checks on temperature, connections, and functionality, were found to be in good condition, with specific temperatures recorded for ambient, supply air, and chilled water. The report concludes with the equipment being cleaned and approved by Almoayed Air Conditioning.