Skip to content

Opening book details…

About this document

Foundation Construction Work Report by ScribdTranslations is a document available to read on EtoBox.

The work consists of an extension of a second floor at the back of an already built house. The foundation will be a continuous footing of reinforced concrete measuring 6m long by 1m wide, with three columns. The construction process of the foundation grill is described, including the cutting and placement of rebar and wire, and the preparation of the columns. Finally, the concrete mix is explained in a ratio of 1:5:5 of cement, sand, and 3/8 gravel.

Author
ScribdTranslations
Language
EN