About this document
Geotechnical Report for Mubarak Seaport by Hassan Elmalt is a document available to read on EtoBox.
The Geotechnical Factual Report for the Mubarak Al Kabeer Seaport Project (Phase 1, Stage 2) details a geotechnical investigation conducted by Gulf Inspection International Company. The investigation included 93 exploratory boreholes and 61 cone penetration tests to assess ground conditions for the design and construction of the seaport. The report outlines the methodologies used for field investigations, laboratory testing, and provides a summary of findings relevant to the channel and basin area.
- Author
- Hassan Elmalt
- Language
- EN