Skip to content

Opening book details…

Can I read Material Takeoff for Washing Bay KM 78 on EtoBox?

Material Takeoff for Washing Bay KM 78 by Widodo Pangestu is a document available to read on EtoBox.

What is Material Takeoff for Washing Bay KM 78 about?

The document is a material take-off for the construction of a washing bay at KM 78, detailing the materials required, their quantities, unit prices, and total costs. The total estimated cost for all materials amounts to Rp 490,660,800. The list includes various construction materials such as wood, cement, and steel, along with their respective codes and pricing information.

Author
Widodo Pangestu
Language
EN