Skip to content

Opening book details…

Can I read Completion & Workover Program N2-W1-34A on EtoBox?

Completion & Workover Program N2-W1-34A by Ryan Sinaga is a document available to read on EtoBox.

What is Completion & Workover Program N2-W1-34A about?

1. The objectives are to maintain well control, provide safe operations, pull and reinstall the ESP, scrape the casing, install a new packer, squeeze cement a C sand interval, perforate a lower C sand interval between 5832-5834 feet, swab the new interval, and install a pump based on swab results to potentially increase production from the C sand. 2. The well is the N2-W1-34A producer located in Kota, Indonesia and was drilled in 2015. It has a 7" tubing hanger and the current ESP will be pulled and reins

Author
Ryan Sinaga
Language
EN