Skip to content

Opening book details…

About this document

Sala Electrica Piso 3 10-10-24 by daniel.rodriguez is a document available to read on EtoBox.

The KFS Hydraulic Flow Calculation Program v4.00 report details the fire suppression system design for the Ampliacion Parque Arauco Etapa 2 project, utilizing Fluoro-K™ Fire Suppression Clean Agent. It includes calculations for agent requirements, nozzle specifications, and system performance metrics, confirming a total agent requirement of 584.00 kg and a system discharge time of 8.7 seconds. The report also outlines the enclosure characteristics and agent concentration profiles necessary for effective fir

Author
daniel.rodriguez
Language
EN