About this document
Offshore Wind Project: Transport Success by 无时差 is a document available to read on EtoBox.
COORDINADORA was tasked with transporting large transition pieces weighing 330 metric tons each for an offshore wind project. They designed a specialized grillage and securing system to transport the pieces on a heavy lift vessel. The grillage was made of steel beams and plates to distribute the weight. A system of 16 hydraulic clamps was used to secure each piece to the grillage during transport. COORDINADORA
- Author
- 无时差
- Language
- EN