About this document
Ferrorep Build Up by smthilansenarathne is a document available to read on EtoBox.
The document outlines the repair process for concrete elements using Ferrorep® for steel reinforcement protection and Neorep® for concrete repair. Ferrorep® consumption is indicated at 50-70 grams per linear meter for two layers, while Neorep® requires 1.75 kg/m² per mm of thickness, with a maximum layer thickness of 4 cm. Additionally, Ferrorep® can be used as a bonding agent to enhance adhesion before applying Neorep®.
- Author
- smthilansenarathne
- Language
- EN