Opening book details…
Can I read MEP Material Submittal for Arbor School on EtoBox?
MEP Material Submittal for Arbor School by Designer Forever is a document available to read on EtoBox.
What is MEP Material Submittal for Arbor School about?
This material submittal document is for split clamps to be used for water supply, drainage, and copper pipes at the G+ 2 Arbor School Building project. The main contractor certifies that the submitted material sample complies with contract drawings and specifications. The material submittal was received by the main contractor, CRC Engineering Construction, and project consultants. Space is provided for the NEB engineer and client representative to approve or request resubmission of the material.
- Author
- Designer Forever
- Language
- EN