Can I read Concrete Base for 18m Mast Design on EtoBox?
Concrete Base for 18m Mast Design by unikmyquestar is a document available to read on EtoBox.
What is Concrete Base for 18m Mast Design about?
1. A structural assessment of the roof slab carrying the waste must be conducted by a competent engineer before establishing use to ensure loads are safely transferred. 2. All concrete work is to be 1:2:4 mix with strength of 25N/mm2 and cured for a minimum of 14 days. 3. Constraints and existing fractures must be investigated before any design changes are made.
- Author
- unikmyquestar
- Language
- EN