Skip to content

Opening book details…

Can I read Sheet Number 3 on EtoBox?

Sheet Number 3 by marcusgabrielbzausa is a document available to read on EtoBox.

What is Sheet Number 3 about?

The document outlines the space requirements for various areas in a Level 2 Municipal Hospital, detailing the necessary square meters for each unit and the number of users. It includes sections such as the Outer Zone, Integrated Zone, Inner Zone, Deep Zone, and Service Zone, with specific areas designated for functions like nursing, waiting, and treatment. The total area required for the second floor is 1,126.03 m2, with circulation space included in the calculations.

Author
marcusgabrielbzausa
Language
EN