Skip to content

Opening book details…

About this document

Scaffold Erection and Dismantling Risk Assessment by prem is a document available to read on EtoBox.

This risk assessment document evaluates hazards associated with erecting and dismantling fixed scaffolding. Key hazards identified include scaffold collapse, falls from the scaffold platform, and falls of materials. Control measures are outlined to reduce the likelihood and severity of each hazard, such as ensuring competent supervision, using sound materials, including guardrails, and prohibiting overloading. With the control measures in place, the risk of each hazard is reduced to an acceptable level.

Author
prem
Language
EN