Skip to content

Opening book details…

About this document

SCADA System Overview for NPCC by Shahrukh Saleem is a document available to read on EtoBox.

1. The SCADA system at the National Power Control Center (NPCC) in Islamabad is outdated, using 1980s technology with limited memory and processing capabilities. 2. The system connects to 25 remote terminal units (RTUs) to monitor the transmission network but has limitations on the number of RTUs it can interface with. 3. Upgrading the SCADA system hardware, software, RTUs and telecommunications is proposed to optimize power dispatching operations and ensure reliable power supply nationwide.

Author
Shahrukh Saleem
Language
EN