Can I read Project Scheduling and Control Analysis on EtoBox?

Project Scheduling and Control Analysis by Thanveer is a document available to read on EtoBox.

What is Project Scheduling and Control Analysis about?

This document provides details on the cost estimation for a 250mm thick reinforced concrete suspended floor slab with drop panels on a 6.5m grid supported by 400x400mm reinforced concrete columns. The total area of the floor slab is 169 square meters. The total cost is calculated to be $21,145.24 or a unit cost of $125.12 per square meter.