Skip to content

Opening book details…

Can I read Third Party Audit of Railway Bridge 1274 DN on EtoBox?

Third Party Audit of Railway Bridge 1274 DN by Siva Krishna Reddy is a document available to read on EtoBox.

What is Third Party Audit of Railway Bridge 1274 DN about?

This report summarizes the findings of the Phase I third party audit of Railway Bridge 1274 DN located between Ullal and Netravathi stations in Southern Railway Palghat Division. The audit included a visual inspection, field measurements, structural modeling and analysis. The bridge is a steel truss type with 16 spans of 45.72 meters each supported on random rubble masonry piers. Some corrosion and distress were observed. Preliminary structural analysis found the bridge adequate to carry 25 tonne axle loa

Author
Siva Krishna Reddy
Language
EN