Cooling Water Pump Installation Report by harry is a document available to read on EtoBox.

1) This document is an inspection test report for the installation of the 2# cooling water supply pump-2 at the PLTA Sei Wampu 1 power plant. 2) The inspection checked that the pump installation met design requirements and that electrical, mechanical, and piping connections were properly installed. 3) The pump passed all 19 inspection items checking specifications, installation position, alignment, electrical connections, piping, valves, pressure gauges, and paintwork.

Author
harry
Language
EN