Retrofit Schedule for Structural Members by engr.jlm3097 is a document available to read on EtoBox.

The document outlines a schedule for retrofitting works at the First eBank Tower Condominium, detailing affected units, structural members to be retrofitted, and the duration of work for each floor. The retrofitting is planned to occur from March 2024 to January 2025, with specific dates and durations for each unit. Tenants are required to vacate their units prior to the commencement of work.