About this document
Hydrostatic Test Inspection Report by Trần Văn Độ is a document available to read on EtoBox.
The document is a request for inspection related to the NEOM Project, specifically for hydrostatic testing of various piping work packages at the Pha Rung Workshop. The inspection is scheduled for November 22, 2024, at 8:00 AM, and includes details about the contractor, inspection details, and attendance confirmations. The subcontractor
- Author
- Trần Văn Độ
- Language
- EN