Skip to content

Opening book details…

About this document

CH 17 Ramales Con Rociador en Cumbrera by Franklin Gustavo Zagaceta Bautista is a document available to read on EtoBox.

The hydraulic overview report for Job Number 1, related to the ACOMETIDA ALMACENES MODULARES MONTE AZUL project, outlines the system pressure, flow demands, and sprinkler data. The system requires a total flow of 1670.22 gpm at a pressure of 108.415 psi, with 12 sprinklers calculated for coverage. The report includes detailed node analysis, showing pressures and discharges at various points in the system.

Author
Franklin Gustavo Zagaceta Bautista
Language
EN