Opening book details…
Can I read Jurong Island Terminal Inspection Report on EtoBox?
Jurong Island Terminal Inspection Report by Gomathyselvi is a document available to read on EtoBox.
What is Jurong Island Terminal Inspection Report about?
The document is a request for inspection of product pumps at a terminal project in Jurong Island, Singapore from October 30th to November 5th, 2017. The inspection will include performance testing, a 4-hour mechanical run, negative suction head pressure testing, vibration measurement, and sound level testing of Mogas 92, 95, 98 and diesel jet fuel pumps. The inspection is requested by Hao Xiao Jie on October 9th, 2017 at the specified location in Shanghai, China.
- Author
- Gomathyselvi
- Language
- EN