Skip to content

Opening book details…

About this document

Ken Ward Sport Centre Overview by haris147break is a document available to read on EtoBox.

The Ken Ward Sport Centre in Hattersley, Greater Manchester, was completed in June 2009 at a cost of £2,006,577, covering a floor area of 1,839m² over two storeys. The facility includes various amenities such as a steam room, sauna, and multimedia equipment, and was constructed using a steel frame. The project was managed under a competitive design and build contract with Tameside MBC as the client.

Author
haris147break
Language
EN