Can I read Process Time Analysis and Improvement on EtoBox?
Process Time Analysis and Improvement by GODHOT_69 is a document available to read on EtoBox.
What is Process Time Analysis and Improvement about?
The document compares the current and improved process times for assembling engine components. The current process takes 274 seconds with 47 seconds of waiting time across 14 steps. The improved process reduces the total time to 212 seconds and waiting time to 21 seconds by combining some steps. Both processes track time, waiting time, and utilization for each step and in total, with the improved process achieving higher overall utilization.
- Author
- GODHOT_69
- Language
- EN