Opening book details…
Can I read Comprehensive Building Works Cost Breakdown on EtoBox?
Comprehensive Building Works Cost Breakdown by sami 6595 is a document available to read on EtoBox.
What is Comprehensive Building Works Cost Breakdown about?
The document outlines the building works and costs for Polling Station A & B Sudair Project Civil Construction. It includes 22 line items for structures and site works such as a control building, switchgear building, fencing, transformers, cable trenches, manholes, sidewalks, and site grading. The total estimated cost for all the specified construction is 37,979,450 Saudi Riyals.
- Author
- sami 6595
- Language
- EN