The document provides estimates for concrete and masonry quantities for the construction of a two-floor building. For the first floor, it estimates the volume of concrete needed for beams, slabs, columns, footings and flooring to total 82.14825 cubic meters. It also estimates the volume of masonry needed for fillers, mortar and plaster to total 20.1992 cubic meters. A total bill of quantities is provided listing the cement, washed sand and gravel needed for the first floor as 1229 bags, 61.273325 cubic mete