Skip to content

Opening book details…

About this document

Concrete Floor Construction Techniques by mohsina Inamdar is a document available to read on EtoBox.

1. Precast hollow concrete blocks are cast in long slabs of 120m length and 1.2m width and cured before being cut to size and either stored or taken directly to construction sites. 2. At the site, the precast concrete slabs are erected into position using tower cranes and a thin reinforced concrete screed is laid on top to seal all joints. 3. Punching shear failure in concrete floor slabs can be prevented by checking the strength of the concrete, amount of reinforcement, and designing additional reinforcem

Author
mohsina Inamdar
Language
EN