About this document
Gulf Coast Pump System Analysis by trilocksp Singh is a document available to read on EtoBox.
A Gulf Coast chemical plant is considering new pumper system equipment to move corrosive liquids from barges into storage. The current pump is monitored closely as it operates under high pressure. Maintenance and rebuild costs are planned to increase after 6000 operating hours. The plant superintendent and line manager have suggested alternatives to the rebuild plan that the safety engineer must review.
- Author
- trilocksp Singh
- Language
- EN