RBT2 Construction Schedule Overview by kamlesh0106 is a document available to read on EtoBox.
What is RBT2 Construction Schedule Overview about?
This document discusses the construction schedule and environmental restrictions for the Robert Bank Terminal 2 project. It is assumed that an underwater stockpile called the Intermediate Transfer Pit will be used to store dredged sand during construction. Most of the stockpile will sit below elevation -5.0 meters, and reclaim of material above this elevation will not be allowed during juvenile salmon closures. Perimeter containment dykes for dredged material will be constructed above elevation -5.0 meters,