About this document
Sir Rey by RACCT Construction and Trading is a document available to read on EtoBox.
Sir Rey is building a fence project that requires materials for footings, columns, and CHB walls. The materials needed include cement, sand, gravel, rebar, tie wire, and concrete hollow blocks. The total estimated material cost is 21,785 Philippine pesos.
- Author
- RACCT Construction and Trading
- Language
- EN