Common IO Panel for 150kV Puger by PrfstBayu 21 is a document available to read on EtoBox.

The document is an as-built drawing for the 150kV Puger substation in East Java and Bali, Indonesia. It was approved on June 10, 2021 by the manager of PT PLN UIP JBTB 3 and the project manager of PT Hasta Prajatama. The drawing shows the schematic diagram for the common input/output panel of the 150kV Puger indoor substation.