About this document
Mivan Formwork: Cost and Time Analysis by Wanda Beasley is a document available to read on EtoBox.
1) The document compares the cost effectiveness and time effectiveness of Mivan formwork versus conventional formwork for concrete construction. 2) A case study of a 32-level residential tower project in Mumbai found that using Mivan formwork saved over Rs. 73 lakh in costs and reduced the construction time by 6 months compared to conventional formwork. 3) Mivan formwork is made of lightweight aluminum which allows for faster construction cycles. It also provides benefits like increased durability, unifo
- Author
- Wanda Beasley
- Language
- EN