Skip to content

Opening book details…

About this document

Mivan Formwork: Cost and Time Analysis by Wanda Beasley is a document available to read on EtoBox.

1) The document compares the cost effectiveness and time effectiveness of Mivan formwork versus conventional formwork for concrete construction. 2) A case study of a 32-level residential tower project in Mumbai found that using Mivan formwork saved over Rs. 73 lakh in costs and reduced the construction time by 6 months compared to conventional formwork. 3) Mivan formwork is made of lightweight aluminum which allows for faster construction cycles. It also provides benefits like increased durability, unifo

Author
Wanda Beasley
Language
EN