Construction Material Cost Summary by tinkumidhun92 is a document available to read on EtoBox.

The document presents a summary of construction materials and their costs for a project at DLRB KM 4.055 on Main Canal-2. It lists various items such as concrete and steel along with their quantities, rates, and total amounts. The overall total amount for the listed items is 2,521,462.22.