About this document
SOP for Coal Mill Operation at SgTPP by Santanu Basak is a document available to read on EtoBox.
1. The standard operating procedure outlines the 10 steps for starting the coal mill at Stage-1 of the Sagardighi Thermal Power Project, including inspecting the mill and components, checking permits, and adjusting airflow and temperatures during startup. 2. Key steps include checking the health of systems like lubrication, hydraulics, and cooling, as well as permits for coal firing and that adjacent mills are running properly. 3. The procedure describes opening gates, starting the mill and coal feeder,
- Author
- Santanu Basak
- Language
- EN