About this document
BP Yamuna by ARUN YADAV is a document available to read on EtoBox.
The document details the measurement calculations for a bottom plug, providing specific volume calculations for different sections (V1, V2, Vol.2, Vol.3, and Vol.4). The final net volume calculated is 57.960 m3. The contractor responsible for the project is UPSBC Ltd.
- Author
- ARUN YADAV
- Language
- EN