Skip to content

Opening book details…

About this document

TBEA India Electrical Load Summary by Ayman Saber is a document available to read on EtoBox.

The document provides the electrical power requirements for various systems at the TBEA Energy (India) Pvt. Ltd. facility in Karjan, Vadodara. It lists the connected electrical loads for the air conditioning system totaling 3279 kW, process and test systems totaling 237 kW, and ventilation systems totaling 110 kW. In total, the grand connected electrical load for the facility is 3626 kW.

Author
Ayman Saber
Language
EN