Skip to content

Opening book details…

About this document

Torque Test Form by carlg.vineyardconstruction is a document available to read on EtoBox.

The document is a torque test report for the CFI Esperanza Tower project, detailing the testing of busduct connections on December 10, 2025. It includes information on the equipment used, calibration details, and results for various bolts, all of which passed the required torque specifications. Additionally, it outlines the testing parameters and includes sections for power and control cable testing, though those results are not provided in the excerpt.

Author
carlg.vineyardconstruction
Language
EN