About this document
Footing Tie Beam Schedule Details by domingo.paulchristian is a document available to read on EtoBox.
This document contains schedules for footing tie beams and second floor beams. It specifies the beam numbers, sizes, reinforcement sizes and spacing for the bottom, top, and shear stirrups of each beam. Reinforcement includes rebar ranging from #10 to #16. Beam sizes vary from 200x300mm to 300x500mm. Stirrup spacing is typically between 75-180mm. Some beams are noted as cantilevered.
- Author
- domingo.paulchristian
- Language
- EN