About this document
LNG Expander Operating Manual by Rabah Amidi is a document available to read on EtoBox.
This document provides operating instructions for a LNG expander in the New LNG Train Skikda Project in Skikda, Algeria. The LNG expander receives high pressure liquefied natural gas from a main cryogenic heat exchanger at 44.9 barg and reduces the pressure to 20.8 barg before sending it to a helium rich gas flash drum. The document describes the normal operation, start-up, shutdown, safety systems, and attachments including an equipment list and utility consumption for the LNG expander.
- Author
- Rabah Amidi
- Language
- EN