Opening book details…
Can I read PVsyst Simulation Report for NHOM_8 on EtoBox?
PVsyst Simulation Report for NHOM_8 by 22142432 is a document available to read on EtoBox.
What is PVsyst Simulation Report for NHOM_8 about?
The PVsyst simulation report for the grid-connected solar system project NHOM_8 in Cam Thành Bắc, Vietnam, indicates a system power of 10.32 kWp with an annual energy production of 14.44 MWh. The total installation cost is $9,757.82, with a levelized cost of energy (LCOE) of $0.034 per kWh and a payback period of 6.1 years. The performance ratio is 77.23%, reflecting the system
- Author
- 22142432
- Language
- EN