Can I read Liquid Penetrant Testing Report for GT-09 on EtoBox?
Liquid Penetrant Testing Report for GT-09 by rajarao.inatt is a document available to read on EtoBox.
What is Liquid Penetrant Testing Report for GT-09 about?
The Liquid Penetrant Testing Report for the SEC Generator Rotor (Unit GT-09) conducted on November 4, 2025, indicates that 100% inspection was performed with no recordable indications found, thus accepted as per ASME Sec VIII, Div -1 standards. The inspection was carried out by NDT Inspectors Mr. Laxmi Prasanna Kumar and Mr. Kailash at the Al Fanar workshop. The report includes details of the materials, inspection techniques, and equipment used during the testing process.
- Author
- rajarao.inatt
- Language
- EN