Opening book details…
Can I read Karnal Drainage 7C Rising Main H.P Calculations on EtoBox?
Karnal Drainage 7C Rising Main H.P Calculations by navneet3bawa is a document available to read on EtoBox.
What is Karnal Drainage 7C Rising Main H.P Calculations about?
The document summarizes calculations for the head required for a rising main to pump 86.4 MLD of water over 1900 meters at a velocity of 1.412 m/s, with a pipe diameter of 0.95 meters. The calculated head is 164 meters and the provisioned head is 165 meters, with a head loss of 3.16 meters over the length of the pipe.
- Author
- navneet3bawa
- Language
- EN