Skip to content

Opening book details…

Can I read Project Delay Report: Design Change Impact on EtoBox?

Project Delay Report: Design Change Impact by ibrahim is a document available to read on EtoBox.

What is Project Delay Report: Design Change Impact about?

The Delay Event Narrative Report details a project delay caused by client instructions received on March 7, 2017, to halt excavation after the planned date. The delay is attributed to the need for a design change in zone 5 part 2, impacting the existing schedule and resulting in a 19-day delay. The report includes a time impact analysis and outlines the affected activities and their relationships in the baseline schedule.

Author
ibrahim
Language
EN