About this document
HCO Supply System Assembly Manual by mohamed elesaily is a document available to read on EtoBox.
The document outlines the resources required for the erection and commissioning of the HCO supply system. It specifies the necessary equipment, including a crane with a 500 kg capacity, standard tools, fastening materials, piping and cabling materials, and personnel requirements. A total of three operators, including one electrician and two assembly operators with hydraulic knowledge, are needed for the installation process.
- Author
- mohamed elesaily
- Language
- EN