Skip to content

Opening book details…

Can I read Bill of Quantities for River Bank Work on EtoBox?

Bill of Quantities for River Bank Work by Shahanara Akter is a document available to read on EtoBox.

What is Bill of Quantities for River Bank Work about?

1. The document is a bill of quantities from Matin Construction Limited for river bank protection work along the right bank of the Meghna River from km 0.300 to km 0.480 (0.180 km) in Bhairab Upazila, Kishoreganj District, Bangladesh. 2. It includes items for erecting bamboo profiles with posts and pegs, site preparation by removing debris, and earthwork to design slopes and prepare the base for bank protection. 3. The total price for earthwork to design slopes and prepare the base is BDT 99,5003.793.

Author
Shahanara Akter
Language
EN

More by Shahanara Akter

Browse all works by Shahanara Akter